Daly City Building Permit — Filed & Tracked For You

Everything contractors, builders and developers need for a Daly City building permit — the Building Division, Title 24 with city amendments and inspections.

Authority: Building DivisionCode: Daly City (Title 24)Phone: 650-991-8061
Northern Peninsula city
About one hundred one thousandCity is its own AHJ
Economic and Community Development
Title 24 with city amendmentsBuilding Division
Dense hillside housing
Downslope and split-level stockExisting-conditions review
Sale of property questions
Common counter enquiryConfirm before listing

Daly City is a northern Peninsula city of about one hundred one thousand residents immediately south of San Francisco, built across coastal hills with a dense stock of attached and split-level houses. Its Building Division, within Economic and Community Development at City Hall on Ninetieth Street, is the sole building authority inside the city.

This guide covers the Building Division, its permit process, Title 24 with city amendments, and the secondary unit, hillside and resale issues that recur in Daly City.

This guide covers work inside the City of Daly City limits. Unincorporated San Mateo County and neighbouring cities are separate authorities.

🏜️

Daly City’s housing stock drives its permit questions. The division fields recurring enquiries about putting an accessory dwelling unit into the lower level of a house, about responsibility for fences between properties, and about what must be done when a house is sold. On a downslope or split-level house those questions are structural as much as procedural, so ask before the design is fixed.

What requires a building permit in Daly City?

California builds on a single statewide code — the California Building Standards Code, known as Title 24 — adopted on a three-year cycle by the California Building Standards Commission. The 2025 edition took effect on January 1, 2026 and governs statewide. Cities and counties enforce Title 24 and may adopt local amendments, but an amendment must be filed with the state and may only be equal to or more restrictive than the state code, justified by local climatic, geologic or topographic conditions. So the first question in Daly City is which authority has jurisdiction — the city on incorporated parcels, the county in unincorporated territory — and what local amendments sit on top of Title 24.

Permit required

  • New commercial, multi-family and residential construction, additions and change of occupancy
  • Structural alterations, load-bearing changes, foundations, decks and retaining walls
  • Electrical work — services, panels, circuits, solar and EV charging — under the California Electrical Code
  • Plumbing under the California Plumbing Code, tied to a licensed contractor
  • Mechanical and HVAC change-outs, and work affecting the Title 24 energy envelope
  • Re-roofing above the exempt scope, pools, signs, and demolition

Often exempt

  • Minor repairs and maintenance replacing materials in kind
  • Small accessory structures below the local threshold, where zoning allows
  • Painting, flooring, cabinetry and other finish work
  • Like-for-like fixture or appliance swaps with no alteration to wiring or piping

Local amendments and thresholds differ from one jurisdiction to the next, so an exempt list from a neighbouring city is not reliable — a project waved through in one place needs a full permit set in the next. An exemption from a building permit is never an exemption from zoning, the statewide energy or green-building codes, or an electrical or plumbing permit. Confirm scope with Building Division before work starts.

The statewide layers that apply everywhere

Several parts of Title 24 apply on top of the base building code and routinely catch projects owners assume are exempt: the California Energy Code (Part 6), among the strictest in the nation; CALGreen (Part 11), California’s mandatory statewide green-building code; and the accessibility provisions in Chapters 11A and 11B. Seismic design is built into the code statewide, and in fire-prone areas the wildland-urban-interface rules of Chapter 7A and Cal Fire defensible-space requirements add a further layer. In Daly City, the Building Division administers Title 24 with city amendments, and dense hillside development makes existing conditions, drainage and lower-level conversions routine review issues.

⚠️ Confirm the authority and the local amendments, then permit before you build. Building without a required permit exposes the job to stop-work orders, penalties, correction orders, delayed occupancy and problems at resale, refinancing or insurance. The safe first step is to confirm the authority having jurisdiction and the code edition in force for the parcel.

Who handles permitting in Daly City?

The Building Division handles plan review, permit issuance and inspections for Daly City, and maintains records of permits, inspections and construction activity for public access.

Daly City permitting contact
DetailInformation
AuthorityCity of Daly City Building Division
ServesThe City of Daly City limits
Phone650-991-8061
CounterCity Hall, 333 Ninetieth Street, second floor
CodeTitle 24 with Daly City amendments
Counter hoursMonday to Friday, full day
LicensingState CSLB license; no local registration
RecordsThe division maintains permit and inspection records

The Building Division runs plan review, permit issuance and inspection for Daly City from the second floor at City Hall, with a full weekday counter, and works alongside Code Enforcement, Engineering and Public Works and the Planning Division on development projects. The division publishes application forms, brochures by project type, and notes on current plan review times where application volume is heavy.

Confirm the parcel is inside the city first; unincorporated San Mateo County and the neighbouring Peninsula cities file with different authorities under their own amendments.

Permit types

Residential permits

Residential work inside the city is permitted and inspected by the division under Title 24 and city amendments. Additions, accessory dwelling units including lower-level conversions, reroofs, decks, retaining walls, solar and EV chargers need permits, and a hillside lot commonly needs drainage and retaining design considered alongside the building work. A CSLB-licensed contractor in the right classification pulls the trade permits.

How California contractor credentials work

California licenses contractors statewide through the Contractors State License Board, not locally. The CSLB issues three license types — Class A for general engineering, Class B for general building, and the Class C specialty classifications for individual trades — and a contractor must hold the classification that matches the work. A license is required for any project valued at one thousand dollars or more in combined labour and materials, and, in practice, for any work that requires a permit regardless of value.

💼

In California the license lives with the state, not the city. The same CSLB license is recognised in every jurisdiction, so there is no separate local contractor registration to secure before pulling a permit. What the permitting authority does check is that the license number is active and carries the right classification for the scope, along with workers’ compensation coverage. Confirm the classification matches before filing.

Commercial permits

Commercial and multi-family work goes through division plan review against the California Building Code, the Energy Code and CALGreen, with city amendments, coordinated with Planning for use permits and design review. It requires CSLB-licensed contractors and drawings stamped by a California-licensed architect or engineer.

Licenses, trade classifications and design professionals

Practically, three credential layers appear on California projects: a CSLB license in the correct classification for the contractor pulling the permit; the specialty C-classifications for the electrical, plumbing and mechanical trades; and, on commercial and larger residential work, drawings stamped by a California-licensed architect or engineer. Confirm what Building Division requires for the specific building before filing.

Daly City permit costs and fees

Budget the city building permit and plan-review fees, separate trade permits, the state Building Standards and seismic surcharges, and any development impact fees. Fees are valuation-based and set by the city; confirm the schedule in force on your filing date.

How Daly City permit fees are structured
Fee componentHow it works
Building permitBased on project valuation or square footage; set by the local schedule
Plan checkA percentage of the permit fee or a flat charge, at submittal
Trade permitsSeparate electrical, plumbing and mechanical fees
State surchargesBuilding Standards and seismic (SMIP) fees collected with the permit
Impact and school feesDevelopment impact and school-district fees in growth areas
Re-inspections and revisionsAdditional fees for failed inspections, revisions and expired permits

California layers two uniform state surcharges — the Building Standards Administration fee and the Strong Motion Instrumentation seismic fee — on top of the local charges, so they appear on permits everywhere. The building and plan-check fees themselves are local and change, and California law limits them to the reasonable cost of providing the service, so a figure from a neighbouring city is not reliable — ask Building Division for the schedule in force on your filing date.

🧮

Need a real number for a specific Daly City project? Send us the scope, address and valuation and we will identify the authority having jurisdiction, the code edition in force and the fee categories that will apply.

Trade permits and who may pull them

Trade permits are separate from the building permit and, on projects that require one, generally cannot be issued until the building permit is in place. Each trade follows its own part of Title 24 — the California Electrical, Plumbing and Mechanical Codes — and is tied to a contractor holding the matching CSLB specialty classification, the same license statewide.

🛠️

California runs the trades on one statewide license. Electrical work is tied to a C-10 contractor, plumbing to a C-36, and heating and air to a C-20, each licensed by the CSLB rather than the city, so the credential travels with the contractor from one jurisdiction to the next. What changes locally is the permit itself and any local amendments — confirm both with the authority that issues it.

  • Electrical work follows the California Electrical Code and a C-10 electrical contractor.
  • Plumbing work follows the California Plumbing Code and a C-36 plumbing contractor.
  • Mechanical work follows the California Mechanical and Energy codes and a C-20 HVAC contractor.

Permit required

  • Service installations, panel upgrades, new circuits, solar PV and EV chargers
  • New plumbing, repipes, water heater change-outs, fixtures, backflow and gas piping
  • HVAC installation and change-out, ductwork, venting and commercial kitchen exhaust
  • Sprinkler, standpipe and fire alarm work on commercial and multi-family structures

Typically exempt

  • Replacing a fixture, switch, receptacle or light with no alteration to wiring or piping
  • Clearing a stoppage without replacing or rearranging concealed piping
  • Filter, thermostat and routine component service
  • Like-for-like appliance repair that does not alter the connection

How to apply for a Daly City building permit

1. Confirm the parcel is inside the city

Only work within the Daly City limits files with the division.

2. Ask about lower-level conversions early

Accessory units in lower levels raise structural and code questions.

3. Confirm the CSLB classification

California licenses contractors statewide; match the classification to the scope.

4. Address hillside drainage and retaining design

Dense hillside lots need both considered with the building work.

5. Submit plans and pay plan-review fees

Allow for the current review times where volumes are heavy.

6. Pull the permit and schedule inspections

Issue the permit and book inspections through the division.

Review, corrections and what actually causes delay

In California, the first cause of delay is uncertainty over jurisdiction — filing with the county when a city should have it, or missing a local amendment on top of Title 24. After that come Title 24 energy and CALGreen documentation, a CSLB classification that does not match the scope, and, in fire or coastal areas, defensible-space or coastal-zone requirements that were not addressed up front. Build the plan-check time into the schedule and confirm the checklist with Building Division before filing.

📅

Approvals do not stay live indefinitely. A California building permit carries a validity period and can expire if work does not start or stalls between inspections. On phased or financed work, keep the permit active with periodic progress inspections and confirm the expiry window before it passes.

Inspections in Daly City

Where a permit is required, standard checkpoints include footing and foundation, framing, rough-in electrical, plumbing and mechanical, insulation and Title 24 energy, CALGreen measures, fire systems on commercial work, and final, with a certificate of occupancy before use. The division assigns the inspector and the construction stages that must be inspected when the permit issues.

California inspections are keyed to the code editions in force when the permit issued, so the approved plans and any energy and green-building documentation need to be on site for the inspector to check against. Confirm the notice Building Division needs and schedule around its inspection windows.

Do not cover work before the required inspection has been approved. Keep the issued permit, the approved plans, product listings, Title 24 energy documentation and your correction responses available on site.

Daly City permit search and official resources

Permit records in California sit with the local authority that issued them. Where the City of Daly City Building Division is the authority for the City of Daly City limits, it holds the building permit, the inspection history and the certificate of occupancy. If you are buying, refinancing or renovating, confirm that past work was permitted rather than assuming it was — and confirm the code edition that was in force.

🔍

Confirm the authority having jurisdiction and the local amendments first. California enforces one statewide code, Title 24, but each city and county adds its own amendments and fee schedule, so the requirements that apply vary by parcel. Confirm current requirements, fees and review turnaround for your filing date.

These are the primary sources behind this guide. Codes, fee schedules and procedures change — confirm the position for your filing date.

Frequently asked questions

Who issues building permits in Daly City?

The Building Division, within Economic and Community Development, issues permits for work inside the city; unincorporated San Mateo County and neighbouring cities are separate authorities.

Can I put an accessory unit in the lower level?

It is one of the division’s most common enquiries. On a downslope or split-level house it raises structural, egress and code questions, so ask before the design is fixed.

What do I need to do when I sell?

The division publishes guidance on what is required when a property is sold; confirm the position before listing rather than during escrow.

Do I need a local contractor registration?

No. California licenses contractors statewide through the CSLB; the license must be active and carry the classification that matches the work.

How long does plan review take?

The division posts current review times, which lengthen when application volume is heavy. Confirm the position before committing to a construction start.

How do I run a Daly City permit search?

The division maintains permit, inspection and construction activity records; confirm past work was permitted before buying, refinancing or renovating.

Simplify Daly City permitting with Alliance Permitting

Daly City rewards asking the awkward questions early. Lower-level conversions and resale obligations are where projects here most often lose months.

250K+Permits approved
All 50States covered
22 YearsJurisdictional depth
Done-for-youWe file, you build

Trusted by leading builders, developers, and national contractors — 22 years of filing in the jurisdictions we write about.

Contractors and builders choose Alliance for Daly City because the work is done by people who have stood at the counter:

  • We confirm the parcel is inside the city and route it to the division.
  • We test lower-level conversion feasibility before design is committed.
  • We address hillside drainage and retaining with the building work.
  • We confirm the CSLB classification matches the scope of work.
  • We track plan review, issuance and the inspection sequence through final.

Alliance Permitting is a permit documentation and submission company. We prepare your paperwork, file it correctly and coordinate with the permitting authority through issuance. We are not a contractor and we do not perform licensed plan review or inspections; that work stays with your licensed team and the jurisdiction.

Ready to break ground in Daly City sooner?

Let Alliance prepare, file, and track your Daly City permits while your crew stays on the job.

This guide is provided by Alliance Permitting for general information about Daly City permitting. Requirements, fees, and procedures change; confirm details with the permitting authority before relying on them.